hushnel
Guide
Most of this got done this Monday. My buddy "the Animal" finsihed sheeting up the T1-11 made up the barn doors and installed the office door along with framing up the 28' workbench.
Started with this.
My wood shop, this is where the 28' workbench is going,
In another day or two it will all be enclosed. Second faze will be the 200 amp service installed. Then a new floor needs to be poured, the previous owners busted the original floor out.
Started with this.
My wood shop, this is where the 28' workbench is going,
In another day or two it will all be enclosed. Second faze will be the 200 amp service installed. Then a new floor needs to be poured, the previous owners busted the original floor out.


